ScaffCheck Special Use Inserts
Perfect for bespoke or non-standard scaffold configurations, the Special Use Insert lets you clearly define specific load ratings, access restrictions, or project-specific requirements.
You save
ScaffCheck Standard Inserts
The essential choice for everyday scaffold safety management, the Standard Insert provides clear, colour-coded identification for general site use. Suitable for most scaffold structures and routine inspection requirements.
You save
ScaffCheck Structural Tie Tag
The ScaffCheck Structural Tie Tag is a single, double-sided “DO NOT REMOVE” tag designed to clearly identify scaffold structural tie points. Durable, weather-resistant and highly visible for on-site compliance.
You save
ScaffCheck Tower – Complete Box
The ScaffCheck Tower Tag is a single, double-sided inspection tag designed for mobile access towers. Highly visible and weather-resistant, it clearly communicates inspection status to maintain tower safety and compliance.
You save
ScaffCheck Very Light Duty Inserts
Ideal for mobile towers, small scaffolds, and light access platforms, the Very Light Duty Insert provides clear load classification at a glance.
You save
Scaffold Board End Bands – 250
Our scaffold board end bands are manufactured from a high quality galvanised steel,. 25mm wide nBox quantity of 250. Customer branding options available POA, and. FOR FREE CUSTOM BRANDING THERE IS A MINIMUM ORDER QUANTITY OF 1000 BANDS.
You save
Scaffold Board Nail Plate (600 Per Box)
Nail Plate Size 200mm x 35mm. Please contact us to have your company name added at no additional cost – up to 19 characters per plate.
You save
Scaffold Board Retaining Bracket
Boards are quickly secured using the scaffold retaining bracket, and. With considerable resistance to both lateral and upward movement their use is recommended in exposed and windy conditions.
You save
Scaffold Sheeting Clear – 170gsm
Clear 170gsm scaffold sheeting for low-rise, short-term projects, allowing around 70% light transmission. Available in 2m × 45m, 2.25m x 45m and 3m × 45m rolls.
.
You save
Scaffold Sleeving - 500m
You save
Scaffold Tie Tags Do Not Remove
Do Not Remove Tie Tag – MISC 190. Clearly identify that Ties are secured & should NOT be removed,. Helps you to comply with legislative requirements and good practice,. 5% of Ties need to be inspected, and Clearly show that NO Ties should be removed by contractors or trades.
You save
Scaffold Tube Lifting Clamp
The scaffold tube lifting clamp is one of the latest products that the team at BLCCS have added to our safety product range, This innovative clamp enables the scaffolder to lift and lower scaffolding tubes to various levels with ease and in the safest possible manner Just use a standard scaffold spanner to secure and release the clamp on up to 2 poles at a time, Workers no longer need to tie or fix the tubes or tube on with rope making this a much safer way of working, and n.
You save














